Home  
  Books  
  Competency  
  COSHH  
  Health & Safety  
  Method State  
  Risk Assesments  
  Software  
  Signs  
  Permits  
  Lockout  
  Terrorism- Evac  
  Maint Tasks  
  Scope of works  
  Free Items  
 
 
Home Cart Contact Us Need Help Checkout FAQ Forgot Password About us New Items ECS Quiz
 





 
Click HERE to show NEW files added in the last 30 days
Currency:  

 
Search
Advanced search


Users online
54 unregistered customer(s)


Live Human


Click above picture to talk to one of our sales team.


Languages


Bestsellers
Coshh assessment
Our price: £0.00
Hazardous substances
Our price: £0.00
Flammable substances
Our price: £0.00
COSHH: A brief guide to the Regulations
Our price: £0.00
Environmental policy (3 pages)
Our price: £0.00
COSHH Assessment form for applying galvanised paint to seal cut metal ends
Our price: £0.00


Engineering Forum
Discussion FORUM
Engineering Forum HERE


Help
Contact us
Privacy statement
Terms & Conditions

OTHER MAINT ITEMS
Ohm's Law Calculator
Cable Size Calculator
Engineering Forum
About HVAC
What is Reliability Excellence?
Measuring Reliability
Three Waves to Reliability
True Cost of Maintenance
Employee Development
Equipment Maintenance Plans
Risk is in the Management
Risk Assessment FAQ
Avoid the Misguided Application of the Maintenance Planner Scheduler
Managing Assets by Criticality
What are Method Statements and how do I write them?
Written Health and Safety Policy Statement
Departmental Health and Safety Policies
Construction Policy Statements
Lockout Procedures
Hot Works
Evacuation and shelter planning
Possible Terrorist threats
Create HVAC control specifications FREE and online!
Electrotechnical Certification Scheme Quiz
Health and Safety at Work Regulations 1999


ShishaPipe UK


Night Scene


System Maintenance Ltd :: COSHH :: COSHH Information :: COSHH Assessment form for applying galvanised paint to seal cut metal ends

Can't find what your looking for? Try our A-Z
COSHH Assessment form for applying galvanised paint to seal cut metal ends
 

COSHH ASSESSMENT FORM

 

Project Name and Location:  

Subcontractor:                                  

Trade: Electrical Installation

Work to be Undertaken: Applying galvanised paint to seal cut metal ends.

Activity or Process: Painting            

Hazardous Substances Used or Created: Galvanised Paint

Manufacturer:   

 

MARK APPROPRIATE BOX



NO

NO

NO

NO

NO

NO

NO

NO

YES

YES

YES

YES

YES

YES

YES

YES

 

 

 

YES

NO

1.

Are all relevant manufacturers safety data sheets attached?

Yes

No

2.

Will employees be given information concerning hazards?  

Yes

No

3.

Will employees be given specific training?  

Yes

No

4.

Will personal protective equipment be provided for employees?

Yes

No

 

a.   Head Protection            

Yes

No

 

b.   Hearing Protection        

Yes

No

 

c.   Masks /RPE

Yes

No

 

d.   Skin Protection

Yes

No

 

e.   Goggles/spectacles

Yes

No

 

f.   Gloves

Yes

No

 

g.   High Viz Clothing

Yes

No

 

h.   Foot Protection

Yes

No

 

i.   Other equipment

Yes

No

5.

Will exposure monitoring and/or control measures be required and are details given below?

Yes

No

6.

Will health surveillance be necessary and are details given below?

Yes

No

7.

Does this substance need to be disposed of by an Authorised Waste Disposal Contractor?

Yes

No

8.

Have First Aid requirements been included?

Yes

No

9.

Have storage requirements for the substance been provided or arranged with site?  

Yes

No

 

 
Details
 
SKU SKU484041

Options
 
Quantity 1 (this product is downloadable)

Add to cart
        
Add to wish list
         Bookmark and Share System Maintenance



Send to friend
Your name: *
Your e-mail: *
Recipient's email: *

Send to friend

Related products

ALL FILES ON THIS WEB SITE (1047 Files - 45,349 KB - 45.3 MB )
Our price: £250.00


Evacuation Guidance (4 Pages including Evacuation Flow Chart) - A must need document for all companys.
Our price: £5.00


All three lockout files
Our price: £4.00


ALL HVAC EQUIPMENT PREVENTATIVE MAINTENANCE TASKS (52 Items)
Our price: £52.00


HVCA 2000 Standard Maintenance Specification for services in buildings (496 Pages)
Our price: £90.00


HIGH PERFORMANCE SCOPES OF WORK (52 Pages)
Our price: £5.00


Recommended products list

WORKPLACE CHECKLIST (simplified)


MANUAL HANDLING CHECKLIST


PRE WATER SAMPLING REGIME CHW CIRCULATION


POWER TRANSFER SWITCH - AUTO TRANSFER SWITCH


DRAINAGE ABOVE GROUND


Manual handling of loads


WORK EQUIPMENT CHECKLIST


WATER SYSTEMS - FILTER CARTRIDGE


POWER CABLE DUCTWORK


PIPEWORK REFRIGERATION


Customer feedback
Product rating


Voting