Home :: Maint Tasks :: EQUIPMENT RELATED :: HVAC EQUIPMENT :: ALL HVAC EQUIPMENT PREVENTATIVE MAINTENANCE TASKS (52 Items)

ALL HVAC EQUIPMENT PREVENTATIVE MAINTENANCE TASKS (52 Items)

ALL HVAC EQUIPMENT PREVENTATIVE MAINTENANCE TASKS (52 Items)
All HVAC Equipment Planed Preventative Maintenance tasks which are 52 different word documents giving you the task and the period of the task.

Please see example below:

LEV SPRAY BOOTH  

   

 

Item

 

Frequency

 

Steps/Action

LEV   SPRAY BOOTH  

01Y

ANNUAL INSPECTION OF LEV - SPRAY BOOTH

STEP 1 - Observe operation of system and note any undue noise or vibration.

STEP 2 - Consult the manufacturer's handbook for dismantling/ re-assembly details, & allowable tolerances.

STEP 3 - Check operation of fans, ensure that the units are fully operational.

STEP 4 - Check any filters, clean and replace as necessary.

STEP 5 - Inspect all trunking, cabling, wiring, relays, insulation, terminal covers and connections within the unit for evidence of damage.

STEP 6 - Check condition/ performance, clean, lubricate and adjust/ replace belts as required.

STEP 7 - Check ductwork hose connections for leaks/ damage. Repair/replace as necessary.

STEP 8 - Report any defects or remedial actions to Supervisor record on Works Order Sheet.

LEV   SPRAY BOOTH  

03M

3 MONTHLY INSPECTION OF LEV - SPRAY BOOTH

STEP 1 - Observe operation of system and note any undue noise or vibration.

STEP 2 - Consult the manufacturer's handbook for dismantling/ re-assembly details, & allowable tolerances.

STEP 3 - Check operation of fans, ensure that the units are fully operational.

STEP 4 - Check any filters, clean and replace as necessary.

STEP 5 - Inspect all trunking, cabling, wiring, relays, insulation, terminal covers and connections within the unit for evidence of damage.

STEP 6 - Report any defects or remedial actions to Supervisor record on Works Order Sheet.

Details
SKU SKU8656
Weight 0.20 Kgs
 
Our price: £62.40 (93.66)
including VAT 20% ( £10.40 )
 
Quantity 1 (this product is downloadable)
: *
: *
: *
Type the characters you see in the picture:


*
STEEL DOORS
Risk Assessment Contact With Hot Water - De-commissioning of LTHW Isolation Valves
Inspections & reports
STEEL DOORS Risk Assessment Contact With Hot Water - De-commissioning of LTHW Isolation Valves Inspections & reports
£6.00
£6.00
£6.00
 
AIR HANDLING PLANT - INDEPENDENT AHU - CARETAKER
FINAL CIRCUITS - CONTROL PANEL (LIGHTING)
SECURITY SYSTEMS  CARD ACCESS SYSTEM
AIR HANDLING PLANT - INDEPENDENT AHU - CARETAKER FINAL CIRCUITS - CONTROL PANEL (LIGHTING) SECURITY SYSTEMS CARD ACCESS SYSTEM
£6.00
£6.00
£6.00
 
Work activity matrix
AIR HANDLING PLANT ANCILLARIES - VAV BOXES
SECURITY DOORS MECHANISM
Work activity matrix AIR HANDLING PLANT ANCILLARIES - VAV BOXES SECURITY DOORS MECHANISM
£6.00
£6.00

Product rating

Customer Reviews